Sr. No. Work Description Time Period Client Name
1 Earth work excavation, stub setting, concreting, tower erection and stringing of panther conductor for 110 kV PSS to the existing palayam TNEB 110/33 kV S.S for evacuation of 50MW wind power project 2018 - 2019 Kshema Power
2 Stringing of 230 EHV hot line with all the necessary accessories for successful commissioning of the project 2018 - 2019 Kshema Power
3 Stringing of conductor, 230KV single circuit and double circuit stringing 2018 - 2019 Kshmea Power
4 Substation control room 2018 - 2019 ABG Elec Consultants
5 Earth work, excavation, stub setting, concreting, tower erection & stringing of AL59 Drake conductor and 1 no earth wire for 66kV SC line on DC tower from the proposed BHANDALLi 66/33 kV PSS to the existing KPTCL Hanur 66/11 kV ss for a total route length of 7.63 Km 2017 - 2018 Mohan Power Infrastructure Pvt ltd.
6 Construction of 66kV control room building, 66kV & 33kV side equipment foundation, cable duct work and fencing work etc. complete at Bhandalli 66/33kV PSS for 30MW solar power project at Karnataka 2017 - 2018 Mohan Power Infrastructure Pvt ltd.
7 Earth work excavation, stub setting, concreting, tower erection and stringing of panther conductor for 110 kV PSS to the existing palayam TNEB 110/33 kV S.S for evacuation of 50MW wind power project 2016 - 2017 Mohan Power Infrastructure Pvt ltd.
8 Construction fo cable duct in the 110/33kV pooling substation project of 55MW solar power plant at devakottai by M/s. Prathama Solar connect Energy Pvt ltd 2020 - 2021 Mohan Power Infrastructure Pvt ltd.
9 Construction of 110kV SC Transmission Line on DC Towers from Moolanur to Nelali, Tamil Nadu 2020-21 Suzlon
10 Construction of LILO on 400kV Waluj-Bhusawal line Circuit-II at 400kV Thaptitanda S/s (Route Length-25.6kms) under Aurangabad zone, Maharashtra 2020-21 MAHATRANSCO
11 220kV Hiriyur Bay extension work, Hiriyur 400/220-110kV PGCIL SS, Hiriyur, Chitradurga, Karnataka 2020-21 Mohan Power Infra Pvt Ltd
12 Pritam Nagar-MP-326.7 MW EHV line, 220kV erection and Stringing 2020-21 Kshema Power